Odd-form insertion projects are evaluated as a complete handling path, not from a product name alone. The key question is whether the actual component can be received, presented, picked, positioned and inserted into the intended PCB under agreed conditions.

Integrated THT production line including axial, radial and odd-form insertion stations
Illustrative Southern Machinery THT insertion line. Each project needs its own component, feeder and PCB review.

1. Identify the actual component

Please start with the part number, drawing when available, clear photos and representative samples. Engineering needs to understand the component body, lead pattern, polarity or keying features, handling surfaces and lead condition. A family name such as connector, relay or switch is only a starting point; different versions can require different handling methods.

2. Show the incoming packaging condition

Packaging affects how a component can be separated, oriented and protected. Please show whether the normal incoming condition is tape, tube, tray, bulk or another format. For tape-packed material, include the actual pitch and orientation. For loose or bulk material, include photos that show how parts arrive rather than only a carefully arranged sample.

3. Provide the PCB insertion context

The PCB review should include a clear board photo and available hole or layout information. Engineering will consider the insertion footprint, nearby components, underside clearance, board support access and the intended insertion direction. This avoids treating the component and board as two unrelated problems.

4. Define the production question

Share the current process, target output or cycle-time objective, product mix, the main manual-insertion pain point, and the expected project timeline. This helps the review focus on the production question that matters to your team, rather than making a generic machine recommendation.

5. Agree the sample-review boundary

Representative components and boards are needed before feasibility, final configuration or acceptance can be confirmed. Before a trial, the parties should agree the sample quantity, operating conditions, observations to record and acceptance criteria. Photos can support the first discussion, but they cannot replace this engineering evidence.

Next step

Use the Odd-Form Insertion Machine and Feeder Solutions pages to see how the handling chain is evaluated. When you are ready, contact Southern Machinery with the available component, packaging and PCB information so the engineering team can identify the next evaluation step.

Request an Engineering Evaluation

Share your component, packaging, PCB and production requirements for an engineering review.

Chat with Southern Machinery Need an engineering evaluation?